Welcome to PADMA MULTIPURPOSE BRIDGE PROJECT
The Padma Bridge is a multipurpose road-rail bridge across the Padma River to be constructed in Bangladesh. When completed it will be the largest bridge in Bangladesh and the first fixed river crossing for road traffic. It will connect Louhajong, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions
General Information
Padma Multipurpose Bridge
Main Bridge Length: 6.15 km
Viaduct: 3.148 km (Road), 532 m (Rail)
Approach Road: 12 km
General Information
Padma Multipurpose Bridge
Main Bridge Length: 6.15 km
Viaduct: 3.148 km (Road), 532 m (Rail)
Approach Road: 12 km
General Information
Padma Multipurpose Bridge
Main Bridge Length: 6.15 km
Viaduct: 3.148 km (Road), 532 m (Rail)
Approach Road: 12 km
Recent Photos
Some latest project pictures
5th Span Erection on 29 June 2018
Padma Bridge 1st Span 7A Erection on P37 & P38, 2nd Span 7B Erection on P38 and P39, 3rd Span 7C Erection on P39 and P40, 4th Span 7E Erection on P40 and P41 and 5th Span 7F Erection on P41 and P42
5th Span Erection on 29 June 2018
Padma Bridge 1st Span 7A Erection on P37 & P38, 2nd Span 7B Erection on P38 and P39, 3rd Span 7C Erection on P39 and P40, 4th Span 7E Erection on P40 and P41 and 5th Span 7F Erection on P41 and P42
5th Span Erection on 29 June 2018
Padma Bridge 1st Span 7A Erection on P37 & P38, 2nd Span 7B Erection on P38 and P39, 3rd Span 7C Erection on P39 and P40, 4th Span 7E Erection on P40 and P41 and 5th Span 7F Erection on P41 and P42
5th Span Erection on 29 June 2018
Padma Bridge 1st Span 7A Erection on P37 & P38, 2nd Span 7B Erection on P38 and P39, 3rd Span 7C Erection on P39 and P40, 4th Span 7E Erection on P40 and P41 and 5th Span 7F Erection on P41 and P42